Section 61 Noise Assessment – Crossrail

Crossrail is the new high frequency railway for London and the South East. When the service fully opens Crossrail trains will travel from Reading and Heathrow in the west to Shenfield and Abbey Wood in the east via new twin tunnels under central London.

As part of the Crossrail scheme, all construction site and associated works are subject to Section 61 (S61) of the Control of Pollution Act 1974. This means that consent by the Local Authority is required.

ACCON have prepared numerous Section 61 consent applications across a number of London Boroughs for a large number of contractors. The work included:

  • Undertaking on-site background noise measurements during proposed working hours at the nearest sensitive receptors;
  • Carrying out noise predictions of the site works utilising measured sound power levels for the equipment and predicting noise levels at each sensitive receptor, based on the detailed construction programme;
  • Providing specialist advice in respect of mitigation measures;
  • Follow-up noise monitoring of the activities has also been undertaken to ensure that the Section 61 requirements are complied with;
  • Carrying out vibration monitoring and assessment to identify risks to building damage.

Throughout the whole process continuous communication with various stakeholders was undertaken at each stage of the S61 process. ACCON have managed the whole S61 process including applications for Variations and Dispensations.

Contact: Graham Parry – 0118 971 0000

Accon UK
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.